Past Projects
Lift Station #65                         Wichita Falls, Texas             $204,780.00

     2,000 LF of HDPE, 1 each Wetwell, Bypass Pump Sewer


cache/wst.opf.2565164.xml
West Denton Substation                                    Ponder, Texas                      $619,000.00

     40,000 CY of excavation and haul off, tree removal, undercutting wet pockets and replace with suitable soil, remove 580’ and install 890’ chain link fence, cut and fill, install 2,500 tons of 6” of compacted crushed rock over entire yard and transition new expansion into existing yard rock, Sod or hydro-mulch all exposed slopes, install 2,800 SF of sheet piling retaining wall, install 3,500 sf of ground grid and fence grounding, install drainage ditches and berms, install silt fences and ditch and catch basin filters.



cache/wst.opf.2565920.xml
Jasper Clearwell Water Treatment               Wichita Falls, TX               $3,545,900.00

     Construction of 5 Million Gallon Water Storage Reservoir, Baffling of Existing Clearwell, Concrete Coating of Existing Structures, and Associated Work.

cache/wst.opf.2615837.xml
Cottonwood Hike and Bike Trail                         Dallas, TX                          $2,377,559.00

    54,000 SF 6” Concrete Paving, 26,000 SF Redi-Rock Retaining Wall, 6,000 SF Cast In Place Retaining Wall, 4,000 yds Excavation, 7,000 tons of Type D Embedment, Misc. RCP Pipe and Headwalls.

cache/wst.opf.2617687.xml

Eagle Mountain Balancing Reservoir     Eagle Mountain, TX $7,427,330.00

     This project consisted of 220,000 CY excavation/embankment, 26,000 CY soil cement, 85,200 SY Geonet/Geomembrane Liner, 7,800 LF under drain system, construction of a 25’ deep inlet structure and a 37’ deep outlet structure both with 72” auto valves, 560 LF 84” cement lined steel pipe, 5,000 LF flex base road, 3,500 LF concrete encased electric dust bank, 5,000 LF chain link fence and 5 acres of seed/mulch
.


El Lago Lake Wall Repair                                 El Lago, TX                              $134,000.00

     Remove & Replace Approximately 140 LF of Lake Retaining Wall.



Highland Oak Crossing Channel Improvements          Keller, TX               $797,068.00

     1,800 CY Gabions in Pond, 1,500 CY Gabions in Channel, Wetland Plantings, 18,000 CY Excavation and Haul Out, Stream Water By-pass, 20,000 SY Seeding.

cache/wst.opf.2565884.xml
Alice Creek                                                   Dallas, TX                                          $630,040.00

    1 acre of Clearing, 1,000 ft of 5’ Chain Link Fence, 1,000 yds of Excavation, 296 Soil Nails, 176 CY Concrete Beam, 1,800 CY Gabions.

Spur 97 Bear Creek CSJ # 0094-08-006              Euless, TX                        $314,680.00

    Drop Structure Concrete Repair, Rip-Rap Repair, Stream Diversion.


Plano Parks Erosion Control                              Plano, TX                             $335,200.00

    600 CY Gabions, Excavation/Fill in Stream, 1,000 tons Rip-Rap, 3,000 SF Trail Concrete.


Midway Ground Storage Reservoir #1                   Lewisville, TX                $300,000.00

    2 MG G.S.T. Piping, 10’ Undercut, and Moisture Condition Backfill.